# Asia–Europe Container Shipping Throughput — SimPy Model
A discrete-event simulation (SimPy) of a liner service moving containers from
**Shanghai** and **Singapore** to **Rotterdam**, used to answer the operator's
seven decision questions. The model derives routes and travel times from the
directed network, treats the Suez Canal and the discharge berths as contended
resources, runs 30 seeded replications per scenario, and reports throughput with
95 % confidence intervals.
> **Headline:** the binding constraint is **Rotterdam's single discharge berth**,
> not the canal and not the fleet. Expanding the canal is a near-no-op (+0.5 %);
> adding ships saturates the berth (diminishing returns, 20-day anchorage waits);
> adding **one more crane-equipped berth at Rotterdam raises throughput +14 % with
> the same fleet** and is the precondition for any fleet growth.
---
## 1. Install and run
Requires Python 3.10+ and the standard scientific stack.
```bash
pip install -r requirements.txt # simpy, numpy, pandas, scipy, pyyaml, networkx, matplotlib
# from this submission directory:
python -m container_sim run # run all scenarios -> results.csv, summary.json, event_log.csv
python -m container_sim verify # reproducibility + event-log reconstruction self-tests
python -m container_sim figures # render the 5 figures in figures/
# optional subset:
python -m container_sim run --scenarios baseline,canal_closed
```
The full run is deterministic and takes ≈ 1 second on a laptop (210 replications).
---
## 2. Routing and dispatching logic
- **Routing — shortest *time*, derived from the graph.** Every leg's free-flow
time is `distance_nm / min(vessel_service_speed × speed_factor, leg_max_speed)`.
Dijkstra (NetworkX) finds the least-time path from each origin to Rotterdam and
back, and is **recomputed for every scenario**, so closing a leg removes it.
- Baseline path: `…→ IOX → BAB → Suez Canal → GIB → NLRTM` (Suez beats Cape).
- Canal closed: the **Cape** path `IOX → CAPE → WAFR → NLRTM` (+3 200 nm) becomes
shortest and is used automatically.
- **Fail-clear.** If no path exists (canal closed *and* Cape forbidden/closed),
the model raises `RouteError` and the scenario is recorded as `failed` with a
reason — never as a misleadingly low throughput. (Verified: see `verify` and the
limitation note below.)
- **Dispatching — return to home port.** Each vessel repeatedly loads full at its
own origin, delivers to Rotterdam, and returns empty (ballast) to reload. The
Suez Canal (capacity 3) is a shared convoy-slot resource held during transit;
Rotterdam's berth (capacity 1) is the discharge resource vessels queue for.
---
## 3. Key results
30 replications/scenario, 180-day horizon. `total_teu` = TEU discharged at
Rotterdam over the horizon; **`vs base`** = ratio to baseline.
| Scenario | Fleet | Route | total_teu (95 % CI) | TEU/day (2nd-half) | Cycle (d) | Anchorage wait (h) | RTM berth util | TEU / vessel | vs base |
|---|--:|---|--:|--:|--:|--:|--:|--:|--:|
| `fleet_small` | 8 | suez | 228 667 (226 319–231 015) | 1 452 | 61.6 | 84 | 0.48 | 28 583 | 0.73 |
| **`baseline`** | **12** | **suez** | **315 333 (312 435–318 231)** | **1 970** | **66.0** | **157** | **0.65** | **26 278** | **1.00** |
| `rotterdam_upgrade` ⭐ | 12 | suez | 360 000 (360 000–360 000) | 2 348 | 59.7 | 30 | 0.37 | 30 000 | **1.14** |
| `canal_upgrade` | 12 | suez | 317 000 (314 378–319 622) | 1 978 | 65.5 | 157 | 0.66 | 26 417 | **1.01** |
| `canal_closed` | 12 | **cape** | 270 333 (269 139–271 528) | 1 670 | 77.9 | 163 | 0.56 | 22 528 | 0.86 |
| `port_slowdown` | 12 | suez | 229 000 (226 955–231 045) | 1 541 | 87.2 | 568 | 0.83 | 19 083 | 0.73 |
| `fleet_large` | 20 | suez | 403 333 (400 503–406 164) | 2 678 | 83.2 | 482 | 0.84 | 20 167 | 1.28 |
⭐ `rotterdam_upgrade` is my own added scenario (Section 5, Q7).
**Resource utilisation at baseline (the bottleneck fingerprint):**
| Rotterdam discharge berth | Shanghai berths | Singapore berths | Suez Canal (NB) | Suez Canal (SB) |
|--:|--:|--:|--:|--:|
| **65 %** | 26 % | 29 % | **3.3 %** | 2.9 % |
Figures in `figures/`: `topology.png`, `throughput_transient.png`,
`fleet_saturation.png`, `bottleneck_utilisation.png`, `scenario_comparison.png`.
---
## 4. Answers to the operator's decision questions
**Q1 — Baseline throughput & uncertainty.**
**≈ 315 000 TEU** over 180 days (95 % CI **312 435–318 231**, n = 30), i.e. about
31.5 full vessel-voyages. Sustained steady-state rate ≈ **1 970 TEU/day**
(second-half; ≈ 1 900 TEU/day counting from the 14-day warmup, which is depressed
by the empty-pipeline ramp — first deliveries land ~day 28; see `throughput_transient.png`).
The CI is tight because delivered TEU is quantised in whole 10 000-TEU loads and
the completed-voyage count is robust to the specified transit/handling noise — the
variability shows up in **cycle time and anchorage wait**, not in the count.
**Q2 — Where is the binding constraint?** **Rotterdam's discharge operation —
one berth worked by 4 cranes (112 TEU/h, ≈ 89 h per ship).** The evidence is from
the model, not the labels:
- It is by far the **most-utilised** resource (65 % vs origins 26–29 % vs canal **3 %**).
- **Degrading** it (`port_slowdown`) cuts throughput **27 %** — the largest swing.
- **Saturating** it (`fleet_large`) collapses marginal returns and explodes the
anchorage queue (below).
- **Relieving** it (`rotterdam_upgrade`) raises throughput **14 %** with the same fleet.
The famous chokepoint — the Suez Canal — is **nearly idle (3 %)** and is *not* the
constraint. Reading the labels would mislead; the utilisation evidence is decisive.
**Q3 — Does adding ships help, or does it saturate?** It **saturates**. As the
fleet grows 8 → 12 → 20:
- Marginal delivered TEU per added vessel falls **21 667 → 11 000**.
- TEU *per vessel* falls **28 583 → 26 278 → 20 167** (ships get less productive).
- Mean anchorage wait rises **84 h → 157 h → 482 h** — at 20 ships each vessel
idles **~20 days per round trip** waiting for the single berth.
- Cycle time stretches **61.6 → 66.0 → 83.2 days**; RTM berth utilisation climbs
**0.48 → 0.65 → 0.84**.
Throughput still rises (+28 % at 20 ships) but the extra ships largely queue; the
fleet is running into the discharge berth (`fleet_saturation.png`).
**Q4 — Would expanding the canal help?** **No — essentially no effect (+0.5 %,
within noise).** The canal is only ~3 % utilised at baseline, so it is not the
binding resource. Adding slots (3 → 12) and speeding transit drops canal
utilisation further (3.3 % → 0.5 %) and shaves a few hours off a ~25-day transit,
but the Rotterdam berth — untouched — still gates the system. Canal spend buys
almost nothing here.
**Q5 — Sensitivity to destination discharge productivity.** **Very high.**
Halving Rotterdam's crane rate (28 → 16 moves/h, `port_slowdown`) cuts throughput
**27 %** (315 k → 229 k), drives berth utilisation to 0.83 and the anchorage wait
to **568 h**. Throughput moves almost one-for-one with discharge capacity — the
clearest confirmation that the discharge operation is the lever.
**Q6 — Operational impact of losing the canal.** **≈ −14 %** (315 k → 270 k,
0.86×). The service reroutes automatically via the **Cape of Good Hope**
(+3 200 nm each way), lengthening the cycle 66 → 78 days, cutting voyages and
per-vessel delivery (26 278 → 22 528 TEU). The model does **not** fail, because a
valid alternative exists; it only fails clearly if the Cape route is also
unavailable.
**Q7 — Single recommended intervention.** **Add a second crane-equipped deep-sea
discharge berth at Rotterdam** (my `rotterdam_upgrade` scenario: berths 1 → 2,
cranes 4 → 8, fleet unchanged at 12). Evidence:
- **+14.2 % throughput** (315 k → 360 k) with the **same ships**.
- Anchorage wait collapses **157 h → 30 h**; per-ship productivity *rises*
**26 278 → 30 000 TEU** (the opposite of what adding ships does).
- It is the **precondition for fleet growth**: with one berth, extra ships merely
queue (Q3); doubling discharge capacity roughly doubles the system ceiling, so
berth expansion is what makes a *later* fleet increase pay off.
Compared with the alternatives, this beats buying 8 ships (far more capital for
+28 % but each ship idles ~20 days/voyage) and dwarfs a canal upgrade (+0.5 %).
---
## 5. Output file schema
All machine-readable files use clear, conventional names — no bespoke key needed.
### `results.csv` — one row per (scenario, replication)
| column | meaning |
|---|---|
| `scenario_id` | scenario name |
| `replication` | replication index (0…29) |
| `base_seed` | base random seed for the scenario |
| `fleet_size` | number of vessels |
| `route_type` | dominant route used: `suez` or `cape` |
| `total_teu` | **TEU discharged at Rotterdam over the horizon** (primary metric) |
| `deliveries` | number of completed discharge voyages |
| `teu_per_day` | TEU/day delivered after the warmup (`> warmup_days`) |
| `teu_per_day_second_half` | TEU/day over the fully-ramped second half (steady state) |
| `teu_per_vessel` | `total_teu / fleet_size` |
| `mean_cycle_time_days` | mean round-trip duration |
| `mean_anchorage_wait_h` | mean wait at Rotterdam for the discharge berth |
| `mean_origin_wait_h` | mean wait at the origin for a load berth |
| `rtm_berth_util` | Rotterdam discharge-berth utilisation (busy ÷ capacity·horizon) |
| `util_port_CNSHA`, `util_port_SGSIN` | origin berth utilisations |
| `util_port_DEHAM` | Hamburg berth utilisation — always **0** (the distractor sink is never served; useful confirmation) |
| `util_L06_CANAL_NB`, `util_L06_CANAL_SB` | Suez Canal slot utilisations (0 when closed) |
### `summary.json` — scenario-level summary + cross-scenario analysis
```
{
"generated_with": "container_sim 1.0.0",
"scenarios": {
"<id>": {
"scenario_id", "description", "horizon_days", "warmup_days",
"replications", "base_random_seed", "fleet_size", "route_type",
"deliver_to", "status", // "ok" or "failed" (+ "reason")
"metrics": { "<metric>": {mean, std, sem, ci95_low, ci95_high, n}, ... }
}, ...
},
"analysis": {
"throughput_ratio_vs_baseline": { "<id>": ratio, ... },
"fleet_marginal_teu_per_vessel": [ {from, to, delta_vessels, delta_teu, marginal_teu_per_added_vessel}, ... ],
"teu_per_vessel_by_fleet": {...}, "anchorage_wait_h_by_fleet": {...},
"baseline_utilisation": {...}
}
}
```
Metrics carrying a 95 % CI: `total_teu`, `teu_per_day`, `teu_per_day_second_half`,
`teu_per_vessel`, `deliveries`, `mean_cycle_time_days`, `mean_anchorage_wait_h`,
`mean_origin_wait_h`, `rtm_berth_util`, `util_L06_CANAL_NB`, `util_L06_CANAL_SB`.
CIs are Student-t with n−1 degrees of freedom.
### `event_log.csv` — auditable vessel-movement trace
One row per important event, sufficient to audit movements and **reconstruct
delivered throughput**: `sum of teu over rows where event_type == "DELIVER"`,
grouped by `(scenario_id, replication)`, equals that replication's `total_teu`
(verified exactly for all scenarios).
| column | meaning |
|---|---|
| `scenario_id`, `replication` | keys |
| `sim_time_h`, `sim_day` | event time (hours; days) |
| `vessel_id`, `vessel_class` | the vessel |
| `event_type` | `LOAD_START`, `DEPART_ORIGIN`, `CANAL_ENTER`, `CANAL_EXIT`, `ARRIVE_DEST`, `DISCHARGE_START`, `DELIVER`, `ARRIVE_HOME` |
| `location` | node id or leg id |
| `route_type` | `suez` or `cape` |
| `teu` | TEU on the move (10 000 on `DELIVER`) |
| `wait_h` | queue wait recorded on the event (anchorage / origin) |
---
## 6. Reproducibility, validation, limitations
- **Reproducible:** per-vessel RNG streams seeded `(base_seed, replication,
vessel_index)`; `python -m container_sim verify` confirms bit-identical reruns,
seed independence, and event-log reconstruction. Common random numbers (shared
base seed) reduce the variance of scenario comparisons.
- **Warmup / transient:** cold start (all vessels at home, *t* = 0). The pipeline
fills by ~day 28, beyond the 14-day `warmup_days`, so we report total TEU (full
horizon) **and** a fully-ramped second-half rate. The cumulative curve
(`throughput_transient.png`) shows a "staircase" from synchronised first
departures — a cold-start artifact, not a steady-state feature.
- **Crane model:** cranes split evenly across berths (aggregate port capacity
exact; Rotterdam exact at 112 TEU/h). This makes origin loads conservatively
slow, but origins stay at 26–29 % utilisation — non-binding — so conclusions are
unaffected.
- **Scope:** unlimited export demand (ships always full), discharge-only
destination, no backhaul, Hamburg unused (distractor), draft non-binding (no
depth limits in the data). See `conceptual_model.md` §8–9 for the full list and
the data-derived vs introduced split.
README.md